Home
A vegetated reinforced earth embankment at the Tannery site
Progress on flood defence walls in Kirkstall from November 2022
Progress on the flood defences at Cardigan Fields Retail Park in March 2022
Progress on the Flood Storage Area in Cragg Wood from February 2023
Following the completion of the first phase of the Leeds Flood Alleviation Scheme, Leeds City Council are working with the Environment Agency on the second phase of the scheme to reduce the risk of flooding across Leeds, using a catchment-wide approach.
The Leeds Flood Alleviation Scheme Phase 2 (Leeds FAS2) is a two-part scheme that aims to reduce flood risk and provide better protection for 1,048 homes and 474 businesses along the river Aire corridor between Leeds City Station and Apperley Bridge using a combination of natural flood management techniques and engineering works.
The scheme involves:
Leeds FAS2 will provide a one-in-200-year level of protection against flooding in the Leeds FAS2 area. This means the scheme will reduce the risk of flooding to a 0.5% chance of occurring in any given year, including a climate change allowance. Once delivered in full, the scheme will protect against a similar event to Storm Eva on boxing day 2015.
The Leeds FAS2 is planned for completion by Autumn 2024.
Flooding at Kirkstall Bridge on Boxing Day 2015. Credit: Ross Parry Agency
Flooding at Wellington Place on Boxing Day 2015. Credit: John Bleakley
Flooding at Cardigan Fields Retail Park, Kirkstall on Boxing Day 2015. Credit: Nick Hunt
Wetter winters, drier summers and increased rainfall linked to climate change means that many parts of the country—including Leeds—will become more likely to flood over time.
The area covered by Leeds FAS2 has already experienced severe flooding, most notably on Boxing Day 2015, following Storm Eva.
Storm Eva brought extreme rainfall and gale force winds to Leeds, which led to major disruption across the city and in the wider area, including Apperley Bridge, Bradford.
The A65 Kirkstall corridor, where part of the works for Leeds FAS2 are taking place, was heavily flooded from the river Aire, resulting in major road closures, damaged utilities and flooding in homes and businesses.
After this devastating event, Leeds City Council presented proposals to government in partnership with the Environment Agency, aimed at reducing flood risk upstream of the city centre, whilst also increasing the standard of flood protection provided by the already complete Leeds FAS1 works in the city centre.
Following these discussions, a two-step approach was agreed, with an initial £87 million secured from central government, for Leeds City Council and partners to progress with Step 1.
In early 2021, an additional £21million allocated to the scheme was secured for Step 2.
Leeds FAS2 focuses primarily on developed areas along the river Aire, upstream of Leeds City Station to the Apperley Bridge area:
Leeds FAS1 and FAS2 are made up of 15 zones, allowing us to simultaneously develop detailed designs in some areas and commence construction in others. Leeds FAS2 encompasses zones 10-15, due to the way that the project was funded, those zones have been grouped into two steps, both of which need to be complete before the 1-in-200 year level of protection will be provided:
There is also a flagship natural flood management programme taking place upstream of Leeds across the River Aire catchment, find out more about the scheme, which is the first of its kind.
Watch a flythrough video of Phase 2 of the Leeds Flood Alleviation Scheme in full along the river Aire.
Tree planting at Bodington Fields
As well as providing an improved level of flood protection, the scheme will:
Volunteer tree planting in Hawksworth
Members of the FAS2 Team Volunteering with the RSC
We are committed to engaging with affected residents and businesses during the development and delivery phase of this project. You can get involved by:
We can be contacted about anything to do with Leeds FAS2 by telephone or email: